The floor had obviously dried enough for them to work.
Progress today:
Old ceiling removed - prepared for the downlights
Cable pull tubes installed
Door between the bathroom and bedroom removed (this will become a wall containing the pipe-in-pipe inspection box)
Some pipe-in-pipe outer tubes and manifolds installed
End wall inner panel (chipboard or similar) mounted (around window)