The floor had obviously dried enough for them to work.

Progress today:

Old ceiling removed - prepared for the downlights
Cable pull tubes installed
Door between the bathroom and bedroom removed (this will become a wall containing the pipe-in-pipe inspection box)
Some pipe-in-pipe outer tubes and manifolds installed
End wall inner panel (chipboard or similar) mounted (around window)
End wall showing window and some pipe-in-pipe manifolds
Ceiling prepared for downlights
Pipe-in-pipe inspection box in the old doorway (will be a wall)
Electic pull tubes in place
Close-up of the pipe-in-pipe manifolds for the bath
Close-up of the end wall showing both bath and basin connections